We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Port Gibson, NY job.
Most crack injection appointments can be scheduled within a day or two of your call.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Epoxy-injected cracks regain much of their original structural strength, which matters for load-bearing foundation walls.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Selling a Port Gibson, NY home with a flagged foundation crack? We can inspect, repair, and provide documentation for the buyer's lender or inspector.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"Crack in our basement wall had been leaking for a year before we finally called. Injection took less than an afternoon and it's been dry since."
— Port Gibson Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Port Gibson Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Port Gibson Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Port Gibson Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
We make the call on-site after inspecting the crack, not before we've seen it.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
A properly injected crack is unlikely to reopen at the same spot, and our work comes with a written warranty covering exactly that.
Turnaround is usually fast enough to fit within a typical closing timeline.
Selling a Port Gibson property on a tight timeline? Call +1-866-476-1348 and we'll prioritize scheduling around your closing date.



Zip codes we serve in Port Gibson, NY: 14537
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.